Typical projects

  • Replacing a bath with a walk-in shower or moving fittings to a new position
  • Fitting a new suite where the existing pipework needs altering
  • An old bathroom with leaks, poor pressure or failing fittings that needs a fresh start

What the service involves

An assessment looks at the existing layout, water supply, drainage routes and access. Moving fittings can involve more pipework than a like-for-like replacement. Agree the proposed layout, plumbing scope, sequence and any coordination with other trades before work begins.

How to prepare

Have a rough idea of the layout you want and which fittings are staying or going. Photos and measurements are useful for a first conversation. If other trades are already booked, share their dates so the plumbing can be sequenced properly. Ask early about anything you are unsure of, such as whether a shower will work with your water pressure.

Need help with your plumbing?

Call Tom at FirstFlow 24/7 to discuss the problem, availability and cost. For a problem with your incoming water supply, contact your water supplier.

Do you manage the whole bathroom renovation?

The complete scope needs to be agreed with Tom. Do not assume tiling, electrical work, flooring or decoration is included in a plumbing quote. Share your plans and ask which tasks he can undertake or coordinate before you book other trades.

Useful details to have ready

Have your postcode, photos taken safely, and details of the fault or planned installation ready. Ask what is included in the quote and whether further investigation could change the price.

Speak to Tom